Red Light Violation Warning (RLVW)
What it does
The OBU matches its lane to the MAP, reads the SPaT countdown for its signal group and warns when the vehicle cannot clear the stop bar before red. Piloted in New York City.
How it works
- The RSU broadcasts the MAP (lanes, stop bars, which signal group controls each lane connection) once a second and the SPaT (the state of every signal group and when it will change) ten times a second.
- The OBU places the vehicle in a MAP lane from its GNSS position and heading, then looks up the signal group for the movement it is about to make.
- From the vehicle's speed and distance to the stop bar it works out whether the vehicle can clear the bar before the signal group's minEndTime, or stop comfortably.
- If the vehicle cannot clear the stop bar before red at its current speed, the display warns the driver while there is still room to stop. Nothing is sent back to the signal: the application lives in the vehicle.
Messages and standards
Messages: SPaT, MAP
Standards: SAE J2735 SPaT and MAP; CTI 4501 Connected Intersections Implementation Guide
In the simulator
The training simulator runs this application with real J2735 message bytes. A fast equipped car is sent on a green that is about to end. Select it and read the countdown on its display against the signal group in the Signals panel; the score counts warnings and red-light violations for equipped and unequipped vehicles.
Where it stands
- In our simulator. You can run it now at /sim and read the messages it produces.
- Piloted. Ran on public roads in one or more USDOT, state or operator pilots; few or no production deployments since.
What holds it back. Needs a surveyed MAP that is kept current and a controller that streams SPaT with honest min and max end times; both are agency work that outlives the pilot.
Wiki articles for this application
- Mapping MAP to SPaT: how signal groups bind lanes to signal states
- SPaT, Signal Phase and Timing: what the traffic signal is doing and when it will change, section "MovementState and MovementEvent"
- MAP, the intersection geometry message: lanes, nodes, connections and signal groups, section "Connections and signal groups"
- How signal timing works, from phases and rings to SPaT signal groups
Facts here are kept to what the public record supports, and thresholds in the simulator are illustrative. See the disclaimer. Something wrong or missing? Tell us.
