Freight Signal Priority (FSP)
What it does
Heavy trucks get a green extension so they do not stop and restart at every signal on a port or industrial corridor. Field-tested in Arizona under the USDOT MMITSS program and piloted in Oakland County, Michigan.
How it works
- A heavy truck approaching a signal sends a Signal Request Message with the truck role.
- The agency sets where freight ranks against transit and emergency requests; many allow only a green extension.
- If the extension fits, the controller holds the green long enough for the truck to clear, so it does not stop and restart.
- The Signal Status Message tells the truck whether the request was granted.
Messages and standards
Messages: SRM, SSM
Standards: SAE J2735 SRM role truck, importance level set by the agency
In the simulator
The training simulator runs this application with real J2735 message bytes. Trucks are the only scheduled priority fleet and "Replay the moment" sends a truck, not a bus. Watch the SRM with role truck and the green extension in the Signals panel.
Where it stands
- In our simulator. You can run it now at /sim and read the messages it produces.
- Piloted. Ran on public roads in one or more USDOT, state or operator pilots; few or no production deployments since.
What holds it back. Truck fleets are not agency fleets, so somebody has to equip them and the agency has to trust the request.
Wiki articles for this application
- Signal priority and preemption: how buses, snow plows, trucks and ambulances get the green, section "What each use case needs"
- SRM and SSM: the request and the answer in signal priority, section "SRM structure"
- Signal priority and preemption: how buses, snow plows, trucks and ambulances get the green, section "Roles, importance and permissions"
Facts here are kept to what the public record supports, and thresholds in the simulator are illustrative. See the disclaimer. Something wrong or missing? Tell us.
